How Long Does It Take to Build a Website in India?
How long does it take to build a website? From 5 to 60+ working days, by type of site, and late content or approvals move the date. Here is how it works.
· 9 min read

How long it takes to build a website depends on what the site has to do. On our published timelines, a professional business website takes 5 to 12 working days, a Shopify store 10 to 20, a full-stack site with a backend and database 15 to 30, and a premium custom build 30 to 60 or more, so anywhere from about one week to twelve weeks or more. The count starts once we have your first payment and the content we need, and it holds only while feedback and approvals come back on time.
Below are our timelines by type of site, the stages between quotation and handover, what pushes a date back, and how to keep yours. Working days mean Monday to Friday, as in our shipping and delivery policy.
How long it takes to build a website, by type of site
Each row is one of our published packages. The weeks column divides working days by five.
| Type of site | What it is | Working days | Roughly in weeks |
|---|---|---|---|
| Launch Website | A professional business site: Home, About, Services, Contact and a gallery | 5 to 12 | About 1 to 2.5 weeks |
| UI / UX Design (design only) | Figma designs and a prototype for your own developer to build | 7 to 15 | About 1.5 to 3 weeks |
| Shopify Website | An online store with a custom theme, payments, shipping and tax set up | 10 to 20 | About 2 to 4 weeks |
| Growth Website | A full-stack site with a frontend, a backend, a database and logins | 15 to 30 | About 3 to 6 weeks |
| Scale Website | A premium custom build with a design system, motion and integrations | 30 to 60+ | About 6 to 12 weeks or more |
If you are still working out the budget, our website design cost guide gives the starting price of each package, and our ecommerce website cost guide compares Shopify with a custom store.
Why one site takes a week and another takes twelve weeks
The gap comes from how many separate pieces have to be designed, built, connected and tested.
- Launch Website. A set of pages built with HTML, CSS and JavaScript, or React with Vite where required. There is no backend or database, so the work is the pages themselves: mobile and tablet layouts, navigation, WhatsApp and click-to-call, a contact form, Google Maps and basic on-page search engine optimization (SEO).
- UI / UX Design. This stops at the design: sitemap and user flow, wireframes, high-fidelity screens for desktop, tablet and mobile, an interactive prototype and the Figma source files. Your developer's build time comes after it.
- Shopify Website. A whole store to set up: a custom theme, collections, product listing and detail pages, cart and checkout, a payment gateway, shipping and tax settings, analytics, and testing before launch.
- Growth Website. A frontend, a backend and a database. Logins, forms that save data, file uploads and API integrations each need building and testing, on a stack chosen with you at quotation.
- Scale Website. A custom design system, scroll-based motion, server rendering, Core Web Vitals work, integrations for payments, a CRM and analytics, and technical SEO with schema and a sitemap. The published range is 30 to 60+ working days, and your quotation fixes where your project sits in it.
The stages of a website project, from quotation to handover
A website project with us moves through six stages, three of them tied to a payment. The order comes from our terms of work and payment schedule, and each payment is tied to a stage of the work rather than to a date.
- Brief and quotation. You send a short brief through our contact page, and we reply within one business day. The written quotation then sets the pages, stack, extras, fee and delivery timeline. If the quotation and our terms ever differ, the quotation wins for that project.
- 40% to start. Work begins when you accept the quotation and the first invoice is paid. The working-day count starts from the day we have that payment and the content we need.
- Planning and design. Depending on the package, this is a plan, a sitemap, wireframes and the design itself. You see the work as it lands, not as one big reveal at the end.
- The checkpoint, and 30%. When the work reaches the design or build checkpoint agreed in your quotation, the second payment of 30% falls due. It pays for the work from the checkpoint to the finished site.
- Build and testing. The site is built, tested and prepared for launch. One full redesign is included before deployment, and big changes cost the least time when you raise them at the design stage.
- Final 30%, then handover. The last payment is due before handover, deployment or transfer of files. The site is then published on your domain and hosting, or handed over with the files and access you need, and the finished work becomes yours.
On a Launch Website quoted at ₹18,000, that is ₹7,200 to start, ₹5,400 at the checkpoint and ₹5,400 before handover. We email you each time we deliver work, and the date of that email is the delivery date. After launch, one specific section can be changed once, and further changes are chargeable under the quotation.
What slows a website project down
A timeline in working days assumes nobody is left waiting. These are the things that break that assumption.
- Late content. Content, images, video and brand assets are yours to provide, unless creating them is part of the quotation. If content, feedback or approvals reach us late, the delivery date moves back by the same number of working days. Photos that arrive four working days late move a Launch Website quoted at 12 working days to 16.
- Feedback in pieces. Our terms ask for feedback to be collected and sent in one pass per round. Conflicting notes from several people count as extra rounds if they reopen work you already approved.
- Second thoughts after approval. One full redesign is included before deployment. A second one is outside the fee and adds to the schedule, and chargeable changes are estimated before we start them.
- New features halfway through. Anything outside the agreed scope is quoted separately, and the extra work adds to the build. An additional page, for example, is ₹1,500 to ₹4,000.
- Missing accounts and access. Depending on the package, you provide the domain, hosting, a Shopify subscription, a cloud account or API credentials. Until those exist, the parts that depend on them cannot go live.
- Overdue invoices. Our terms say an overdue invoice pauses the work, so an unpaid milestone pushes the date back too.
If the delay is on our side
If a delivery will be late for reasons on our side, we tell you as soon as we know, with a new date. You can accept it or cancel. If you cancel, we refund every payment for a stage we have not finished and delivered, and hand over the work completed so far. Our cancellation and refund policy has the full detail.
How to keep your website on schedule
Use this as a checklist before you pay the first 40%.
- Gather your content first. Page text, logo, photos and videos. If you have no usable images, our custom images cost ₹99 to ₹150 each.
- Set up your accounts. Register the domain and hosting in your own name, or open your Shopify account, so you can give us access when the build needs it.
- Prepare your products. For a store, have the product information and images ready for every product before the build starts.
- Name one decision maker. One person approves the work and collects everyone else's notes.
- Send feedback in one pass. Put every note for a round in one message, so it counts as one round.
- Fix the scope in writing. Keep a list of new ideas for after launch rather than adding them halfway through the build. Our checklist for choosing a web design company lists what a quotation should include.
- Pay milestones when they fall due. An overdue checkpoint invoice pauses the build.
After launch: when your site shows up on Google
Going live and showing up in Google are two separate steps. Google says the vast majority of sites in its results are found automatically as it crawls the web, mainly through links from pages it has already crawled, so you usually only need to publish your site. If you do ask Google to crawl a page, it says crawling can take from a few days to a few weeks, and the request does not promise the page will appear in results quickly, or at all.
Each of our website builds includes at least basic SEO. Ongoing SEO is a separate monthly service, explained in our SEO cost guide.
If you have a launch date in mind, put it in your brief. The written quotation sets the timeline before any work starts, so you know it before you pay anything.
Questions people ask
How long does it take to build a website in India?
With us, a professional business website typically takes 5 to 12 working days, a Shopify store 10 to 20, a full-stack site with a backend and database 15 to 30, and a premium custom build 30 to 60 or more. Working days are Monday to Friday. The count starts when we have your first payment and the content we need, and late content or approvals move the date back.
Can a website be built in one week?
A simple one can. Our Launch Website, with Home, About, Services and Contact pages, a gallery and a contact form, takes 5 to 12 working days, so one working week is the short end of that range. It needs your content ready at the start and quick approvals. Sites with logins, a database or an online store take longer.
How long does it take to build a Shopify store?
Our Shopify Website package typically takes 10 to 20 working days. That covers the store setup, a custom theme, collection and product pages, cart and checkout, a payment gateway, and shipping and tax settings. You provide the domain, the Shopify subscription, product information, images and content, and the timeline assumes they reach us on time.
When does the website timeline start?
The count starts on the day we have your first payment, 40% of the fee, and the content we need to begin. It runs in working days, Monday to Friday. If content, feedback or approvals reach us late, the delivery date moves back by the same number of working days.
What happens if my website is delivered late?
If the delay is on our side, we tell you as soon as we know, with a new date. You can accept it or cancel. If you cancel, we refund every payment for a stage we have not finished and delivered, and hand over the work done so far. If the delay comes from late content or approvals, the date moves back by the same number of working days.
Sources
Keep reading
Process · 9 min read
How to Choose a Web Design Company in Gurgaon: A Checklist
Read the articleReal Estate · 9 min read
Real Estate Website Design in Gurgaon: Features and Cost
Read the articlePricing · 12 min read
Website Design Cost in India (2026): What Each Budget Buys
Read the articleE-commerce · 12 min read
Ecommerce Website Cost in India: Shopify vs Custom (2026)
Read the article